Part I -
9/29/2006 - Boxing in the main central heating and AC vent was a four day
project. It was necessary before starting the installation of the drop ceiling
and lighting. (And what a pain in the butt project this was).
Part II -
10/10/2006 - The drop ceiling on the other hand went better. Only
about three days to put the ceiling in on both side and put the lighting in.
These are take before the tiles are painted to match the rails, which were
painted before they were put up.
These were taken after the tiles were painted and the lighting installed.